
Future of Denison Park Pool Remains Uncertain in Corning
According to Corning Recreation Director Alex Hamilton, the pool developed a serious leak during the 2022 season that worsened significantly the following year. “In 2023, during spring preparations, we found that water was flowing out almost as fast as we were putting it in,” Hamilton said. A structural analysis conducted by HUNT Engineers and Architects revealed more than 220 feet of linear cracks in the pool’s shell, along with multiple holes.













